Module 5: Choose where to stay

Move in, operate, and exit cleanly

Create the evidence and operating habits that reduce utility, repair, access, and deposit disputes.

What to know first

What to know first

Complete a signed condition and meter record at handover, keep every payment and repair conversation organized, give notice exactly as required, arrange the final inspection, return every access item, and document the unit and balances at exit.

Treat handover as the first exit step

Record meter readings, keys, cards, remotes, furniture, appliances, walls, floors, bathroom, kitchen, windows, and existing damage before normal use. Use clear wide and detail images. Send or sign the record through a channel that proves the other party received it.

Confirm how electricity, water, internet, building fees, and repairs are billed. If the landlord or building charges an internal rate, record the unit and calculation rather than only the first total.

Keep a maintenance ledger

Report problems promptly with date, description, evidence, access availability, and urgency. Distinguish safety or active damage from comfort issues. Keep the resolution, contractor visit, cost approval, and any effect on rent or deposit in the same thread.

Do not authorize an expensive repair or deduct it from rent without understanding the contract and obtaining written agreement or qualified advice. Good documentation cannot repair a weak legal position, but it can prevent the facts from disappearing.

  • Date and evidence
  • Who was notified
  • Access and action
  • Cost and resolution

Work backwards from departure

Put the notice deadline, required delivery method, viewing access, cleaning, utility closeout, internet return, inspection, key return, deposit account, and final departure on a timeline. Ask what documentation will support deductions and when the undisputed balance is returned.

At exit, repeat the condition and meter record and obtain acknowledgement of access items returned. Keep the local account or international payment route available long enough to receive a legitimate refund.

Ten-minute fieldworkProduces an artifact

Build the tenancy operating folder

Create the structure before move-in or repair history begins.

  1. 1Create sections for contract, handover, payments, meters, repairs, and exit.
  2. 2Prepare the photo and inventory sequence.
  3. 3Add notice and return deadlines to the calendar.
  4. 4Write the evidence required at the final inspection.

Output: A tenancy record that starts with the exit in mind.

Before marking complete

Completion check

  • Handover acknowledged
  • Meters recorded
  • Payments receipted
  • Repairs logged
  • Exit dates calendared

Evidence desk

Official sources and verification routes

These links support the lesson's time-sensitive facts and verification routes; they do not turn every editorial checklist into an official rule. Sources were checked on the dates shown. Open the live source again before a time-sensitive decision.

Keep exploring

Use this work on the site